What this code requires
CALGreen Section 4.408 requires residential construction projects to divert at least 65% of construction and demolition waste away from landfill — or keep total landfill disposal at or below 3.4 pounds per square foot of the project. Before the city approves your permit, you need a waste management plan on file showing how you'll hit that target. New single-family homes, additions, and remodels over a certain square footage all fall under this section.
How to fix it
Calculate estimated waste weight and project area
Divide the estimated weight of construction and demolition waste you will send to landfill by the building area in square feet. If that number is 3.4 lbs/sq ft or under (Section 4.408.4, low-rise), you meet the weight-based threshold. Most residential remodels and new builds exceed that, so most contractors use the 65% diversion path instead. Either way, run this math first — it tells you which standard you're actually targeting before you write the plan.
List every material category with diversion method
Your plan needs a line item for each material stream: concrete and masonry, wood framing and finish lumber, drywall (clean gypsum), metals (copper pipe, rebar, steel studs), cardboard and paper, and mixed C&D debris. For each, note whether it goes to a certified recycler, a transfer station, or a salvage facility. Don't bundle everything under one facility — plan-checkers want to see that you've thought through each stream.
Identify your receiving facility by name and address
Name the specific recycling facility or hauler for each material. In Orange County, local CalRecycle-certified C&D processors accept clean loads. Listing the facility's name and city is usually enough for plan check — you don't need to attach a contract at submittal, but you do need something more specific than 'local recycler.' Check your city's approved hauler list if one exists; some cities restrict which facilities qualify.
Show the diversion percentage estimate in the plan
State your estimated diversion percentage explicitly. A well-sorted job comfortably clears 65% — that is the floor, and good material separation typically lands well above it. Your plan should show the math: estimated total waste in tons or pounds, minus what you expect to recycle, divided by total. A simple table works. The goal is to show the plan-checker that 65% is achievable, not just claimed.
Place the waste management plan note on the cover sheet or general notes
The plan-checker has to be able to find it. Most cities want the waste management plan either as a dedicated sheet or as a clearly labeled note block on the general notes sheet. Burying it in the specifications binder doesn't count for plan check purposes. Label it 'CALGreen Section 4.408 Construction Waste Management Plan' so the reviewer doesn't have to hunt.
Check for local ordinance requirements above the state minimum
Some Orange County jurisdictions require a post-construction report confirming actual diversion. Anaheim's waste management program and Huntington Beach's construction recycling requirements both have documentation expectations at job closeout. If your city requires hauler receipts or facility weight tickets, note that you'll collect and submit them before final inspection. Addressing this upfront prevents a last-minute correction at final.
Verify drywall and specialty materials are covered
Drywall is the most commonly missed material. Clean drywall (not painted or water-damaged) is accepted by gypsum recyclers and counts toward your diversion percentage. Check that your plan explicitly lists gypsum board. Other materials to check: carpet and flooring, asphalt shingles if a re-roof is part of the project, and glass. Each additional material stream covered strengthens the plan and pads your diversion percentage.
Take the CALGreen 4.408 fix steps with you
All 7 steps in one email, so you have them on site instead of on this page.
Why you got flagged
Plan-checkers flag CALGreen 4.408 most often because the waste management plan is missing entirely. The sheet set arrives, the plan-checker opens the notes and spec sheets, and there's no mention of waste diversion at all. Most contractors assume it's handled by the recycler at the end of the job — but the code requires the plan upfront, before approval, not after the dumpster haul.
The second scenario is an incomplete plan. A contractor submits a one-liner that says "all waste will be recycled per CALGreen." That doesn't cut it. The plan needs to name the specific materials being diverted (concrete, drywall, wood framing, metals), identify the receiving facility or recycler, and show the estimated diversion percentage or projected weight per square foot. A vague note gets kicked back.
Third flag: the plan was submitted but doesn't cover all regulated materials. Drywall is the one that trips people up most. A lot of waste management plans list lumber, concrete, and metal, then forget that clean drywall is separately recyclable and commonly accepted by gypsum recyclers in Southern California. If the plan omits it, the plan-checker can note the gap.
Finally, some corrections come from a local ordinance that's stricter than the state standard. Orange County cities like Anaheim and Huntington Beach sometimes require documentation from the hauler or facility confirming receipt of the diverted material. If your plan doesn't reference that documentation step, expect a note on the corrections letter.
The official code
CALGreen Section 4.408 — Construction Waste Reduction, Disposal and Recycling