What this code requires
CALGreen 4.304.1 requires new residential construction projects with 500 square feet or more of landscaped area to comply with the Model Water Efficient Landscape Ordinance (MWELO). To comply, you need a landscape plan that includes a water budget calculation, an irrigation system design, and a plant palette that stays within the Maximum Applied Water Allowance (MAWA) for the site. Under MWELO, new construction triggers it at 500 sq ft of landscape area and rehabilitated landscapes at 2,500 sq ft.
How to fix it
Confirm whether your project triggers MWELO
Measure all landscaped areas on the project site, including any existing landscaping that will be altered by the permit scope. MWELO applies to new construction with 500 sq ft or more of landscape area, and to rehabilitated landscapes of 2,500 sq ft or more. Hardscape doesn't count, but planted and turf areas do, and pools and spas count as water features. If you're right at the line, document your area takeoff on the plans so the checker can verify the calculation. Show the square footage breakdown by area type on the title sheet or landscape plan.
Calculate the Maximum Applied Water Allowance (MAWA)
For residential landscapes the MAWA formula is: MAWA = (ETo - Eppt) x (0.62) x [(0.55 x RLA) + (1.0 x SLA)], where ETo is the reference evapotranspiration for your city, Eppt is effective precipitation (used only where the local agency allows it), RLA is the regular landscape area in square feet, and SLA is the special landscape area (edible plants, recreational turf, etc.). Include this calculation in a landscape water use table on your plan sheets. Take the ETo for your city from the MWELO Appendix C table or CIMIS, and confirm it with the city before finalizing the number.
Prepare the MWELO landscape documentation package
Under the performance option, MWELO's Landscape Documentation Package has six elements: a project information sheet, a soil management report, landscape, grading and irrigation design plans, and the water efficient landscape worksheet. The core of it is: (1) a planting plan with a plant palette that lists each species, its water use factor (WUCOLS classification: VL, L, M, H), and the area it covers; (2) an irrigation plan showing zone layout, head types, flow rates, and precipitation rates; (3) a water budget table showing that the Estimated Total Water Use (ETWU) stays at or below the MAWA. Many designers use free MWELO water budget worksheets published by MWDOC or DWR to generate the table. Include all of them in your submittal.
Add zone-level irrigation data to each irrigation zone
Each irrigation zone on your plan must show: the zone type (drip, spray, or rotor), the precipitation rate in inches per hour, the scheduled run time, and the calculated applied water in gallons per year. If you're using a smart controller, note the manufacturer, model, and that it's SWAT-certified. Generic notes like 'drip irrigation per manufacturer specs' are not enough. The checker needs zone-level numbers to verify compliance with the water budget, so list them in a zone schedule table on the irrigation plan.
Include soil and mulch specifications
Add a planting note specifying a minimum 3-inch layer of mulch in all planting areas (rock mulch is acceptable in low-water zones). Include a soil preparation note if the soil will be amended. Compacted clay soils that haven't been tilled won't support water-efficient planting, and some checkers require evidence of soil health improvement. MWELO requires compost at a minimum of four cubic yards per 1,000 sq ft of pervious area, incorporated to a depth of six inches, so a note such as 'Compost at 4 cu yd per 1,000 sq ft incorporated to 6 inches, per soil test and MWELO' typically satisfies this requirement and keeps the correction from coming back.
Submit the Landscape Documentation Package as a separate plan sheet
Put all MWELO elements on a dedicated sheet labeled something like 'L-1: Landscape and Irrigation Plan — MWELO Compliance.' Keep the water budget table, planting legend, and irrigation schedule on the same sheet where possible. Some cities require a signed Certificate of Completion at final inspection confirming the landscape was installed per the approved plan. Ask the building department at permit issuance whether they require this form, and get the blank template early so it doesn't hold up your certificate of occupancy.
Verify landscape inspection requirements before closing the permit
Many jurisdictions require a landscape inspection before the certificate of occupancy is issued. Find out whether the city's planning or building department handles landscape inspections, since in some cities they're split between departments. At inspection, the inspector will check mulch depth, plant installation, and that the irrigation controller is programmed per the approved schedule. Have a copy of the approved L-1 sheet on site. If you changed any plants or moved irrigation zones during installation, get the plan updated and re-approved before scheduling the inspection.
Take the CALGreen 4.304.1 fix steps with you
All 7 steps in one email, so you have them on site instead of on this page.
Why you got flagged
Plan-checkers flag CALGreen 4.304.1 most often because the landscape plan is submitted without the MWELO water budget calculation. The Maximum Applied Water Allowance is a formula based on site area, the evapotranspiration adjustment factor (ETAF), and the local reference evapotranspiration rate. When a designer leaves that calculation off the submittal, the checker has no way to confirm the irrigation design meets the cap, so the correction goes out.
A second common flag: the irrigation design shows a drip or spray system but doesn't call out flow rates, precipitation rates, or controller settings by zone. MWELO requires the irrigation design to demonstrate compliance with the water budget by zone, not just show pipe runs and head locations. If your plans read like a standard irrigation layout without zone-level water data, expect a 4.304.1 correction.
Plans sometimes include a landscape plan and an irrigation plan but skip the soil and mulch requirements. MWELO also requires a minimum 3-inch mulch layer in planting areas and a soil health measure. If those notes are missing from the landscape plan, 4.304.1 is often cited alongside the water budget correction.
A fourth pattern shows up on addition and ADU projects where the applicant believes the existing front yard landscaping doesn't count toward the 500 sq ft threshold. If the permit scope touches the existing landscape area (regrading, new irrigation, replanting), plan-checkers typically count that area, pushing the total over 500 sq ft and triggering MWELO even when the new construction footprint alone is small.