What this code requires
CMC 701.6 is the California Mechanical Code section that governs how combustion air openings must be sized for fuel-burning appliances installed in confined spaces. When a furnace, boiler, or water heater sits in a sealed closet or small mechanical room, the space has to have openings or ducts that supply enough air for safe combustion. Most residential and light-commercial permits that include a new or relocated gas appliance in a utility closet get flagged here when the drawings do not show those openings or do not size them correctly.
How to fix it
Calculate whether your space is confined
Add up the total rated Btu/hr input for every fuel-burning appliance in the room. Divide the room interior volume (length x width x ceiling height, in cubic feet) by that total input in thousands of Btu/hr. If the result is less than 50 cubic feet per 1,000 Btu/hr, the space is confined and CMC 701.6 applies. For example: a 96 cu ft closet with a 60,000 Btu/hr furnace plus a 40,000 Btu/hr water heater gives 96 / 100 = 0.96 cu ft per 1,000 Btu/hr. That is well below 50, so you need combustion air openings. Note the calculation on the plans.
Choose a combustion air method and note it on the drawings
CMC Chapter 7 gives you two main paths. The indoor air method (CMC 701.5) brings air in from adjacent interior spaces through two openings: one within 12 inches of the top of the enclosure, one within 12 inches of the bottom. The outdoor air method (CMC 701.6) brings air from outside through openings or ducts. Pick one and label it on the mechanical sheet before sizing. If the closet is interior with no exterior wall, indoor air is usually simpler. If the closet is on an exterior wall, direct outdoor air can give you a smaller duct.
Size indoor-air openings at 1 sq in per 1,000 Btu/hr, 100 sq in minimum
For the indoor air method, each opening (high and low) must provide 1 square inch of free area per 1,000 Btu/hr of total appliance input, with a minimum of 100 square inches per opening. A 100,000 Btu/hr combined load needs 100 square inches free area per opening. Note: free area accounts for louver blade blockage. A standard fixed louver is typically 25 to 60 percent free area. If you are using a louvered grille rated at 50 percent free area, specify a grille that is 200 square inches total face area to deliver 100 square inches free. Label the free area and face area separately on the detail.
Size outdoor-air openings per CMC 701.6.1 or 701.6.2
For the outdoor air method, opening size depends on total Btu/hr input and how the air arrives. With two openings (CMC 701.6.1), each needs 1 sq in per 4,000 Btu/hr directly or through vertical ducts, or 1 sq in per 2,000 Btu/hr through horizontal ducts. One opening near the top (CMC 701.6.2) needs 1 sq in per 3,000 Btu/hr and at least the total vent connector area. At 100,000 Btu/hr, two vertical-duct openings need 25 sq in each. Show the duct route, size, and termination on the plans.
Add a combustion air detail to the mechanical sheet
A note that says combustion air per code is almost always insufficient and will get you another correction. Instead, add a boxed detail on the mechanical sheet showing the closet dimensions, the appliances and their input ratings, the opening or duct locations, sizes, and free-area calculations. Include the method name (indoor or outdoor), the openings heights above finished floor, and the free-area values. One clear detail eliminates the ambiguity that causes re-reviews.
Verify the adjacent space is adequate for indoor-air method
If you are using indoor air, the adjacent space that supplies the air must itself not be confined. If both the utility closet and the room next to it are small spaces, the plan-checker may flag that neither can supply adequate air. The adjacent space needs to have enough volume or its own connection to outside air. Document the adjacent room dimensions and confirm the combined volume meets the 50 cu ft per 1,000 Btu/hr threshold, or show that the adjacent space is openly connected to additional volume.
Check for direct-vent sealed combustion exceptions
If the furnace or water heater is a direct-vent (sealed combustion) appliance that pulls all its combustion air from outside through a dedicated sealed pipe, CMC 701.1 exempts direct-vent appliances from the Chapter 7 combustion air rules because the combustion air never comes from the room. If every appliance in the space is direct-vent, you may not need room openings at all. Confirm this by noting on the plans that each appliance is direct-vent with a sealed combustion air intake, and include the manufacturer model confirming direct-vent operation. Plan-checkers will want to see the notation clearly so they do not have to guess.
Take the CMC 701.6 fix steps with you
All 7 steps in one email, so you have them on site instead of on this page.
Why you got flagged
The most common trigger is a utility closet with a furnace or water heater drawn on the plans with no combustion air notation at all. A plan-checker reading the mechanical sheet sees the appliance, notes the closet dimensions, and flags it the moment the room area cannot supply air naturally on its own. Confined-space rules kick in when the volume of the room is less than 50 cubic feet per 1,000 Btu/hr of the total installed appliance input. If your closet is 3 feet by 4 feet by 8 feet, that is 96 cubic feet. A 60,000 Btu/hr furnace needs 3,000 cubic feet of volume for the unconfined-air method to apply. That closet is confined, and you need to show the openings.
A second common scenario involves ADU conversions where the mechanical room was sized for the original house layout but a second appliance gets added. The total Btu/hr input goes up, the volume-per-Btu ratio drops below the threshold, and the space that was borderline now clearly requires combustion air openings. The drawings often miss this because the designer sized the room for the old appliance and did not recalculate after the scope change.
The third scenario is a plan that does show openings but specifies them incorrectly. CMC 701.6 allows two primary methods: the indoor air method, which uses two openings (one high, one low) each sized at 1 square inch free area per 1,000 Btu/hr of total input with a 100-square-inch minimum, and the outdoor air method, which ducts air directly from outside with different sizing criteria depending on duct length and configuration. A common drawing mistake is showing a single louvered door and calling it combustion air, which does not satisfy either method as written.
The official code
CMC Chapter 7 — Combustion Air, California Mechanical Code (state adoption reference)
Read the source →