What this code requires
CRC R507.3 requires exterior decks to have footings sized to carry the imposed loads to the ground, with size determined by tributary area and soil bearing capacity per Table R507.3.1. Footings must extend at least 12 inches below undisturbed ground. Two situations are exempt: grade-bearing joists that bear directly on soil, and freestanding decks of 200 square feet or less with a walking surface no higher than 20 inches above grade.
How to fix it
Calculate the tributary area for each footing
Tributary area is the portion of the deck load that bears on a single footing. To find it, draw lines midway between each footing in both directions and sum the enclosed area. For a rectangular deck on four evenly spaced corner footings, each corner footing carries one quarter of the total deck area. For a 200 sq ft deck on four corners, each footing carries 50 sq ft of tributary area. Intermediate footings along a beam line each carry proportionally less. Write the tributary area calculation on your plans next to each footing location so the plan-checker can follow the math without guessing.
State the assumed soil bearing capacity on the plans
CRC Table R507.3.1 cross-references footing size against both tributary area and soil bearing capacity. For most residential sites in California without a geotechnical report, 1,500 psf is the standard presumptive soil bearing value. Call this out explicitly on the plans: 'Assumed soil bearing capacity: 1,500 psf per Table R401.4.1(1). No soils report performed.' If your site has fill, expansive clay, or known soft soils, a geotechnical report is needed before you can use a different bearing value.
Look up the required footing size in Table R507.3.1
With your tributary area and soil bearing value in hand, find the corresponding footing diameter (or dimensions) in Table R507.3.1. If your tributary area falls between two rows, interpolation is permitted but extrapolation beyond the table is not; using the row with the larger area is the simple, conservative choice. Record the required footing size for each footing location. For footings with different tributary areas across the deck, you may have more than one footing size — call each one out on the footing schedule.
Show the 12-inch minimum depth on the footing detail
R507.3 sets the minimum footing depth at 12 inches below undisturbed ground. Add a cross-section detail showing this dimension explicitly with a leader and dimension line. Undisturbed ground means native soil that hasn't been excavated and backfilled. If your site has any grading history, clarify how the depth is measured from the bottom of any disturbed material. In hillside areas or sites with recent grading, the inspector may require deeper footings or confirmation that the bearing surface is truly undisturbed.
Create a footing schedule with all footings tagged
Don't rely on the deck plan view alone to communicate footing requirements. Add a footing schedule table on the structural or civil sheet listing: footing mark (F1, F2, etc.), tributary area served, assumed soil bearing capacity, required footing diameter, and minimum embedment depth. On the deck plan, tag each footing with its mark so the plan-checker can trace from schedule to location without hunting. This table is the most direct way to satisfy R507.3 — it shows the sizing rationale and the result in one place.
Document the freestanding exemption if you are using it
If the deck qualifies for the freestanding exception, prove it on paper. Add a note stating that the joists bear directly on precast concrete pier blocks at grade with no beams or posts, the total deck area in square feet, and the walking-surface height within 36 inches of the edge. The thresholds: 200 sq ft total area and 20 inches maximum height at any point within 36 inches of the edge. If either is borderline, note how you measured it. A deck that's 199 sq ft and 19.5 inches at the high end should have both measurements confirmed on the drawing, not left implied.
Show the grade-bearing joist detail if that exception applies
Grade-bearing joists that sit directly on prepared grade are exempt from R507.3 footing requirements, but the plans need to show the configuration. Add a cross-section detail showing the joist bearing on soil, the bearing surface preparation (compacted native soil or a gravel layer), and the rot-resistant or pressure-treated specification for wood in contact with the ground. Simply noting 'grade-bearing framing' on the plan isn't enough. The detail has to show what the code intends: a joist sitting on grade, not on a post and footing assembly.
Check for related deck corrections before resubmitting
R507.3 corrections rarely come alone. The deck chapter flags tend to cluster. Before you resubmit, also review your plans against R507.9 (ledger connection to the house if attached), R507.4.1 and R507.5.2 (post-to-footing and beam-to-post connections), and R507.4 (post sizing). A plan-checker who's already flagging footings will likely flag missing connection hardware details on the same pass. If you're redlining the plans anyway, address the whole deck chapter in one shot rather than trading corrections letters across multiple review cycles.
Take the CRC R507.3 fix steps with you
All 8 steps in one email, so you have them on site instead of on this page.
Why you got flagged
The most common corrections cite R507.3 because footing information simply isn't on the submitted drawings. Plan-checkers reviewing a deck addition need to confirm the footings are sized for the load — if the plans just show a 12-inch diameter concrete footing with no reference to tributary area or soil bearing value, that's a flag. The checker has no way to verify the footing is adequate without the numbers.
A second frequent scenario: the footing depth is shown, but the soil bearing value assumed for sizing isn't called out. CRC R507.3.1 ties footing size directly to both tributary area and presumptive soil bearing capacity. If your plans show a footing diameter but don't state the assumed soil bearing (typically 1,500 psf for residential sites without a soils report), the checker has to send it back.
Plans that show an isometric or 3D deck drawing without a separate footing schedule or Table R507.3.1 callout are another common trigger. The deck looks great in the drawing, but there's no place on the sheet that actually shows how the footing was sized. Plan-check departments want a clear table or detail, not an implied calculation.
A fourth situation comes up on elevated decks where the contractor assumes the 20-inch exception applies. If the walking surface is 21 inches above grade, even an inch over, the exemption disappears and full footing documentation is required. Getting the measurement wrong at submittal means the correction comes back.
The official code
2025 California Residential Code, Chapter 5 — Floors and Decks (R507.3 Deck Footings)
Read the source →